New Construction Fees

  • Annexation Fee: $787 per acre
  • Bulk Water Meter
    • Deposit: Cost of the meter
    • Monthly Rental: $40
    • Monthly Reading fee: $20
    • Water Consumption Charge
      • Tier 1 (units 1-4): $6.49 per unit (748 gallons)
      • Tier 2 (units 5-11): $6.95
      • Tier 3 (units 12+): $11.15
  • Fire Flow Fee: $200
  • Static PSI $85.00
  • Inspection Fee (Deposit: 2% of costs with a minimum of $500): Actual cost
  • Preliminary Design and Plan Check: $20 per lot
    • Deposit: $700
  • Service Installation (estimate of installation available upon request): Actual cost
  • Water Main Construction (estimate of installation available upon request): Actual cost
  • Will Serve Letter: $40 per lot
  • Will Serve Letter Subdivisions
    • Deposit (exceeds five lots or parcels): $250
    • Major Subdivision: Actual cost
    • Minor Subdivision (not to exceed five lots or parcels): $100
  • For new service and does not include materials and labor costs (call for estimated costs) not including meter cost.
    Meter SizeAmount
    1 inch meets Fire Code (5/8 meter use)$5,418
    1 inch$10,836
    1 1/2 inches$16,254
    2 inches$27,090
    3 inches$59,598
    4 inches$92,106
    6 inches$178,794

    The new service installation minimum cost is $600.